Modification of Existing Building (B+G+M+11) Based on Approved QCDD Mechanical Ventilation Drawing
Client: M/s. Abdullah Abdulghani & Bros. Co. W.L.L
Consultant: Al Jazeera Consulting Engineering
Scope of Work: AAB Tower needs some modification of their building based on QCDD Approved MV Drawings for preparation of renewing their certificates for QCDD. Multichoice was selected as Smoke Extract System Contractor.
Supply, Installation, Testing & Commissioning of Ductworks, Pressurization System, Smoke Extract System at Car Park Basement, Electrical Works and Controls System. (Completed Handed Over)